Atiku Abubakar Way underground flood-control tunnel

See the message that will be shared

I'm proud to share that work on Atiku Abubakar Way underground flood-control tunnel in Uyo LGA is finished. A 1.3 km underground tunnel, 8 metres deep, was built to carry flood water.

See the photos and the facts here: https://umoeno.cavilconsult.com/projects/uyo-atiku-abubakar-way-underground-flood-control-tunnel/

Has this made a difference where you live? Tell me in the comments, and share this with a neighbour so more people can see it.

Download project card

A 1.3 km underground tunnel, 8 metres deep, was built to carry flood water. The package also covered reconstruction of a section of Atiku Abubakar Way, streetlights and reconstruction of Afaha Ube Street.

Key facts

Area of work
Flood and erosion control
LGA
Uyo
Status
Completed
Where
Atiku Abubakar Way
Tunnel length
1.3km
Tunnel depth
8m
Inaugurated
24 April 2024, by former President Goodluck Jonathan
Awarded
August 2023; work began September 2023
Contractor
Hensek Integrated Services
Build time
About eight months (awarded August 2023, started September 2023)
Commissioned
24 April 2024

Photos

FinishedAerial view of the rebuilt Atiku Abubakar Way with its new drain line
Aerial view of the rebuilt Atiku Abubakar Way with its new drain line
FinishedAerial view of the finished road and drain through the neighbourhood
Aerial view of the finished road and drain through the neighbourhood
FinishedNew asphalt and covered drain along Atiku Abubakar Way
New asphalt and covered drain along Atiku Abubakar Way
FinishedAerial view of the road with walkway and drain
Aerial view of the road with walkway and drain
BeforeThe flooded road before work began
The flooded road before work began

About the project

The Atiku Abubakar Way flood-control tunnel is a 1.3-kilometre underground channel in Uyo. It is 8 metres deep and carries storm water away from Atiku Abubakar Way, one of the city's main roads.

The road used to flood so badly in the rainy season that it became impassable, cutting off businesses, schools and homes. Governor Pastor Umo Eno ordered the work after he was sent a photo of the flooded road. The Akwa Ibom State Government awarded the contract in August 2023, and Hensek Integrated Services started work in September 2023. The job was finished in about eight months.

The same package rebuilt the flooded section of Atiku Abubakar Way with streetlights and reconstructed Afaha Ube Street, which restored access through the once waterlogged area up to Ikot Ekpene Road.

Former President Goodluck Jonathan inaugurated the tunnel and the roads on 24 April 2024. Traders and drivers on the corridor said their businesses and journeys had returned to normal. The project is meant to keep the road open all year and protect homes and shops from flood, in line with the ARISE Agenda.

The project at a glance

StatusCompleted
Length1.3km
Kind of workFlood and erosion control
ServesResidents along Atiku Abubakar Way and 4 more

Project timeline

Plannedannounced or approved
Work startedsite work begins
Ongoingwork under way
Finishedcompleted or commissioned
Commissioned24 April 2024

What was built

  • 1.3km underground flood tunnel, 8m deep
  • Rebuilt section of Atiku Abubakar Way
  • Streetlights
  • Reconstructed Afaha Ube Street
  • Drains

Who it serves

People and places connected by this project.

  • Residents along Atiku Abubakar Way
  • Residents of Afaha Ube Street
  • Shop and business ownersLocal business
  • Motorists and commutersCommuters
  • Pedestrians

Where it helps

  • Movement and access
  • Safety and security
  • Trade and income
  • Water and sanitation
  • Housing and shelter

Uyo LGA at a glance

Where this project sits among all 52 projects recorded in Uyo.

52projects
Completed 23 (this project)Ongoing 28Status not stated 1
Roads and bridges
15
Government and public buildings
10
Tourism and recreation
8
Flood and erosion control
5
Homes for vulnerable people
4

Impact Analysis

An assessment of the impact of these accomplishments on the people and communities.

For families and communities

Flooding puts homes and lives at risk when it rains heavily. The tunnel is built to take storm water away, so families along this route are less exposed, and streetlights make the road safer at night.

For work and income

Floods damage shops, stock and the road itself. By moving storm water away, the tunnel protects businesses and property on this route and reduces the cost of repeated road repairs.

Project location

Atiku Abubakar Way

The map shows the area. An exact project pin is still being confirmed.

The map loads as you reach this section.

Development goals

This project supports the goals below. Each figure shows how many of the 429 projects on this portal back the same goal.

  • 9Industry and infrastructure200 of 429 projects
  • 11Sustainable communities133 of 429 projects
  • 13Climate action9 of 429 projects

More from Uyo

See everything in Uyo

Governor Umo Eno speaking

Governor Umo Eno

See what is being done near you

Pick your LGA to see roads, schools, health centres and homes, with photographs.

Choose your LGA