ARISEUmo Eno Legacy

Home / Urue Offong/Oruko / Project

Roads and bridges · Urue Offong/Oruko LGACompleted

Urue Offong-Ibotong Road

See the message that will be shared

I'm proud to share that work on Urue Offong-Ibotong Road in Urue Offong/Oruko LGA is finished. A 2.9km road linking the council secretariat at Urue Offong with Utuku (Ukuko II) and Ibotong Eweme.

See the photos and the facts here: https://umoeno.cavilconsult.com/projects/urue-offong-oruko-urue-offong-ibotong-road/

Does this road make your daily trip easier? Tell me in the comments, and share this with a neighbour so more people can see it.

Download project card

A 2.9km road linking the council secretariat at Urue Offong with Utuku (Ukuko II) and Ibotong Eweme. It was commissioned on 28 October 2024 and is the first road built in the LGA by the state government.

Key facts

Area of work
Roads and bridges
LGA
Urue Offong/Oruko
Status
Completed
Where
Urue Offong secretariat to Ibotong Eweme, through Utuku (Ukuko II)
Length
2.9km
Commissioned
28 October 2024
Links
Council secretariat, Utuku (Ukuko II) and Ibotong Eweme
Contractor
Bulletine Construction Company Nigeria Ltd
Supervision
Akwa Ibom State Ministry of Works and Fire Service
Specification
Drains on both sides, culverts and a spur; 150mm stone base and 60mm compacted asphalt; 20-year design life
Local labour
About 80 percent of the workforce drawn from local youths
First state road in the area
First road built by the state government in the area since the LGA was created in 1991
Completed
28 October 2024
Commissioned
28 October 2024

Photos

FinishedThe finished road through Urue Offong
The finished road through Urue Offong
FinishedThe road towards Ibotong, with road markings and solar street lights
The road towards Ibotong, with road markings and solar street lights
Newly surfaced road with centre markings running straight past palm trees
Newly surfaced road with centre markings running straight past palm trees

About the project

The Urue Offong-Ibotong Road is a 2.9km road in Urue Offong/Oruko Local Government Area of Akwa Ibom State. Also called the Secretariat Road, it runs from the council secretariat at Urue Offong through Utuku (Ukuko II) to Ibotong Eweme, linking three communities.

The Akwa Ibom State Government under Governor Umo Eno funded the road. Bulletine Construction Company Nigeria Ltd built it, under the supervision of the State Ministry of Works and Fire Service. The road has drains on both sides, culverts and a spur, with a 150mm stone base and 60mm of compacted asphalt. It is designed to last 20 years. About 80 percent of the workers on site were young people from the area.

It is the first road built by the state government in the area since the LGA was created in 1991. The people are mostly farmers, fishermen and traders, and the road gives them a paved route between the headquarters town, Ibotong and the markets beyond.

The road is expected to open up the council headquarters for growth and boost trade in the area. More roads have been promised, including one from Oruko Junction to Eyubiasang Beach.

Governor Umo Eno commissioned the road on 28 October 2024, represented by the Deputy Governor, Senator Akon Eyakenyi.

The project at a glance

StatusCompleted
Length2.9km
Kind of workRoads and bridges
ServesResidents of Urue Offong and Ibotong and 4 more

Project timeline

Plannedannounced or approved
Work startedsite work begins
Ongoingwork under way
Finishedcompleted or commissioned
Completed28 October 2024
Commissioned28 October 2024

What was built

  • 2.9km paved road with road markings
  • Solar street lights
  • Link between the council secretariat, Utuku and Ibotong Eweme

Who it serves

People and places connected by this project.

  • Residents of Urue Offong and Ibotong
  • Farmers and fishermenLocal business
  • Traders and market usersLocal business
  • People with business at the council headquartersLocal business
  • Transport operatorsCommuters

Where it helps

  • Trade and income
  • Movement and access
  • Education

Urue Offong/Oruko LGA at a glance

Where this project sits among all 9 projects recorded in Urue Offong/Oruko.

9projects
Completed 6 (this project)Ongoing 3
Schools
2
Government and public buildings
2
Roads and bridges
1
Health
1
Homes for vulnerable people
1

Impact Analysis

An assessment of the impact of these accomplishments on the people and communities.

For families and communities

The road makes it easier for people in Ibotong to reach the headquarters town for services, school and market. It is seen as a sign that the area is no longer left out of state road projects.

For work and income

A paved road helps farm produce, palm oil and seafood move to buyers with less delay.

Project location

Urue Offong secretariat to Ibotong Eweme, through Utuku (Ukuko II)

The map shows the area. An exact project pin is still being confirmed.

The map loads as you reach this section.

Development goals

This project supports the goals below. Each figure shows how many of the 429 projects on this portal back the same goal.

  • 9Industry and infrastructure200 of 429 projects
  • 11Sustainable communities133 of 429 projects

More from Urue Offong/Oruko

See everything in Urue Offong/Oruko

Governor Umo Eno

Governor Umo Eno

See what is being done near you

Pick your LGA to see roads, schools, health centres and homes, with photographs.

Choose your LGA