I'm glad to share that work on Oron Marine Terminal, jetty, shore protection and warehouse in Oron LGA is under way.

See the photos and the facts here: https://umoeno.cavilconsult.com/projects/oron-oron-maritime-infrastructure/

Will this make your journeys easier? Tell me in the comments, and share this with a neighbour so more people can see it.

Download project card

A new terminal, passenger and cargo jetties, warehouse, cold room, workshop, car park, recreational area, hotel and two ferries on the Oron waterfront, built to make Oron a centre for water transport, fish trade and coastal tourism.

Key facts

Area of work
Transport
LGA
Oron
Status
Ongoing
Where
Oron; Idua Assang village named in a quoted remark
Features
Terminal building, passenger jetty, cargo jetty, floating bar, JTF jetty, warehouse, cold room, drying facilities, workshop, car park, recreational area, hotel, two ferries
Contractor
JMK Construction Company
Progress reported
Terminal and warehouse roofed, shore protection and jetty shelter in place, ferries close to finished (October 2026)
Shore protection
550 metres of steel shore protection, with 525 metres of piling
Jobs
150 direct jobs during construction; about 2,000 direct jobs expected once it opens
Ferries
Two ferries ordered from Naval Shipyard Limited for an Oron to Calabar service; contract signed with the Nigerian Navy on 29 December 2023
Local skills
The Nigerian Navy is to train 15 engineers to run the workshop that maintains the ferries
Site inspection
Governor inspected progress in January 2026 and visited again on the 26 May 2026 Oron tour
Hotel and leisure
Hotel, recreational area and floating bar
Car park
5,500 square metres, about 200 vehicles
Storage
Cold room, dry storage and fish drying facility
Ferry
First passenger ferry being built at the Naval Shipyard, Port Harcourt, for an Oron to Calabar service
Flagged off
12 March 2025, by Governor Umo Eno
Progress
80% done
Ministry or agency
Ministry of Works & Fire Service
Contractor
JMK Construction Ltd
Started
12 March 2025

Photos

During workTerminal building, warehouse and passenger jetty on the Oron waterfront
Terminal building, warehouse and passenger jetty on the Oron waterfront
During workAerial view of the terminal, warehouse, jetty and car park
Aerial view of the terminal, warehouse, jetty and car park
During workOne of the two ferries being built for the Oron service
One of the two ferries being built for the Oron service
During workPassenger ferry hull painted in the state colours
Passenger ferry hull painted in the state colours
During workWheelhouse of the passenger ferry
Wheelhouse of the passenger ferry
During workWarehouse with loading bays
Warehouse with loading bays
Show all 28 photosShow fewer photos
During workCold room door inside the warehouse
Cold room door inside the warehouse
Oron maritime infrastructure
Oron maritime infrastructure
Oron maritime infrastructure
Oron maritime infrastructure
During workOron maritime infrastructure
Oron maritime infrastructure
During workOron maritime infrastructure
Oron maritime infrastructure
During workOron maritime infrastructure
Oron maritime infrastructure
Design modelOron maritime infrastructure
Oron maritime infrastructure
During workOron maritime infrastructure
Oron maritime infrastructure
During workOron maritime infrastructure
Oron maritime infrastructure
During workTerminal building and warehouse on the Oron waterfront under construction
Terminal building and warehouse on the Oron waterfront under construction
During workBlue-roofed warehouse and terminal buildings beside the jetty and river
Blue-roofed warehouse and terminal buildings beside the jetty and river
During workSteel shore protection along the reclaimed Oron shoreline
Steel shore protection along the reclaimed Oron shoreline
During workJetty piles driven into the river beside the terminal building
Jetty piles driven into the river beside the terminal building
During workTwo-storey terminal building going up behind the steel sheet piles
Two-storey terminal building going up behind the steel sheet piles
During workTerminal site, car park area and roads being set out
Terminal site, car park area and roads being set out
During workWarehouses and jetty approach seen from the air
Warehouses and jetty approach seen from the air
During workAerial view of the Oron Beach waterfront with new steel shore protection and reclaimed land
Aerial view of the Oron Beach waterfront with new steel shore protection and reclaimed land
During workTerminal buildings under construction behind the shoreline sheet piling at Oron Beach
Terminal buildings under construction behind the shoreline sheet piling at Oron Beach
During workExcavator and reinforcement steel for building foundations beside the river at Oron Beach
Excavator and reinforcement steel for building foundations beside the river at Oron Beach
During workA ferry hull under construction at Oron
A ferry hull under construction at Oron
During workShore protection with a jetty and boats at Oron
Shore protection with a jetty and boats at Oron
During workA waterfront warehouse building
A waterfront warehouse building

About the project

The Oron Maritime Infrastructure Project is a waterfront development on the Oron beachfront in Oron Local Government Area, on the Cross River estuary. Governor Umo Eno started it under the Blue Economy targets of the ARISE Agenda, to put Oron's coastal location to work for water transport, trade, tourism and commerce.

The Akwa Ibom State Government is paying for the project, and JMK Construction Company Limited is building it. The Governor flagged off the work on Wednesday 12 March 2025, with a target of September 2025. Work was still going on in 2026. The Governor inspected progress in January 2026 and visited the site again during his Oron tour on 26 May 2026. By October 2026 the terminal and warehouse were roofed, the jetty shelter and shore protection were in place, and the ferries were close to finished.

The project has a terminal building, a passenger jetty, a cargo jetty, a floating bar, a Joint Task Force jetty, a warehouse, a cold room, drying facilities, a workshop, a car park, a recreational area and a hotel. Steel shore protection runs along the waterfront. Two ferries are being built for the state at the Naval Shipyard in Port Harcourt for an Oron to Calabar service.

The project is meant to make Oron a maritime and commercial hub and to link the coastal communities better. It should make it easier to move passengers and goods by water, support fishing and fish processing, and cut the fish that is lost after each catch. It should also bring hotels and visitors to the coast, create jobs for young people and local businesses, make the waterways safer and draw private investment.

In the long run, the project could make Oron a main gateway for coastal trade, give local communities more ways to earn a living and help Akwa Ibom State grow its economy beyond oil, in line with the ARISE Agenda.

The project at a glance

StatusOngoing
Started12 March 2025
Kind of workTransport
ServesBoat operators and ferry passengers and 5 more

Project timeline

Plannedannounced or approved
Work startedsite work begins
Ongoingwork under way
Finishedcompleted or commissioned
Work started12 March 2025

What was built

  • Terminal building
  • Passenger jetty
  • Cargo jetty
  • Floating bar
  • Joint Task Force (JTF) jetty
  • Warehouse
  • Cold room
  • Drying facilities
  • Workshop
  • Car park
  • Recreational area
  • Hotel
  • Two ferries

Who it serves

People and places connected by this project.

  • Boat operators and ferry passengersCommuters
  • Fishermen and fish tradersLocal business
  • Residents of Oron's waterfront communities
  • Traders moving goods by waterLocal business
  • Visitors to the waterfront
  • Hotel guests and tourists

Where it helps

  • Trade and income
  • Water and sanitation
  • Safety and security
  • Movement and access
  • Housing and shelter

Oron LGA at a glance

Where this project sits among all 9 projects recorded in Oron.

9projects
Completed 5Ongoing 2 (this project)Planned 1Status not stated 1
Roads and bridges
2
Health
2
Jobs and business support
1
Schools
1
Transport
1

Impact Analysis

An assessment of the impact of these accomplishments on the people and communities.

For families and communities

Jetties, a terminal and two ferries will make travel by water safer and more orderly. Shore protection guards the waterfront, and the JTF jetty supports security on the waterways.

For work and income

The cold room, warehouse and drying facilities help fishermen and traders keep more of each catch. The terminal, hotel and recreational area should bring visitors, trade, private investment and jobs for young people and local businesses.

Project location

Oron; Idua Assang village named in a quoted remark

The map shows the area. An exact project pin is still being confirmed.

The map loads as you reach this section.

Development goals

This project supports the goals below. Each figure shows how many of the 429 projects on this portal back the same goal.

  • 9Industry and infrastructure200 of 429 projects
  • 8Decent work42 of 429 projects

More from Oron

See everything in Oron

Governor Umo Eno speaking

Governor Umo Eno

See what is being done near you

Pick your LGA to see roads, schools, health centres and homes, with photographs.

Choose your LGA