I'm proud to share that work on Nto Ide-Ikot Amba Bridge and approach road in Obot Akara LGA is finished. A bridge with a 60 metre span and an 800 metre approach road.

See the photos and the facts here: https://umoeno.cavilconsult.com/projects/obot-akara-nto-ide-ikot-amba-bridge-and-approach-road/

Does this road make your daily trip easier? Tell me in the comments, and share this with a neighbour so more people can see it.

Download project card

A bridge with a 60 metre span and an 800 metre approach road. It is completed.

Key facts

Area of work
Roads and bridges
LGA
Obot Akara
Status
Completed
Where
Nto Ide to Ikot Amba
Bridge span
60m
Approach road
800m
Commissioned
16 May 2024, by Governor Umo Eno
Contractor
Seyang Nigeria Limited
Structure
Reinforced concrete bridge piled to 23 m, 450-tonne capacity
Started
2021, under Governor Udom Emmanuel; about 60% complete in May 2023
Ministry or agency
Ministry of Works & Fire Service
Contractor
Seyang Nigeria Limited
History
Started by an earlier administration
Started under
Udom Emmanuel
Commissioned
16 May 2024

Photos

Nto Ide-Ikot Amba Bridge and approach road
Nto Ide-Ikot Amba Bridge and approach road
FinishedNto Ide-Ikot Amba Bridge and approach road
FinishedNto Ide-Ikot Amba Bridge and approach road
BeforeThe old Nto Ide crossing washed out by floodwater, broken timber deck and a toppled machine in the river
The old Nto Ide crossing washed out by floodwater, broken timber deck and a toppled machine in the river
BeforeThe collapsed old crossing seen from the road end, broken deck and floodwater below
The collapsed old crossing seen from the road end, broken deck and floodwater below
Show all 15 photosShow fewer photos
During workBridge beams in place with a worker pitching the stone slope of the approach embankment
Bridge beams in place with a worker pitching the stone slope of the approach embankment
During workBridge beams on concrete piers over the river with the abutment and sandbags at the bank
Bridge beams on concrete piers over the river with the abutment and sandbags at the bank
During workSide view of the bridge beams on concrete piers with the finished abutment slope at right
Side view of the bridge beams on concrete piers with the finished abutment slope at right
FinishedFinished bridge deck with marked lanes, kerbs and railings crossing the river, seen from above
Finished bridge deck with marked lanes, kerbs and railings crossing the river, seen from above
FinishedDrone view of the finished bridge and approach road across the river
Drone view of the finished bridge and approach road across the river
During workBridge pier and beams on the river bank with the black-coated abutment wall at the crossing site
Bridge pier and beams on the river bank with the black-coated abutment wall at the crossing site
During workRows of precast concrete bridge beams laid out on the casting yard near the site
Rows of precast concrete bridge beams laid out on the casting yard near the site
During workAerial view of the early works: bridge piers and beams across the river and the cleared approach road
Aerial view of the early works: bridge piers and beams across the river and the cleared approach road
During workConcrete pile caps and reinforcement bars for the bridge piers on the construction ground
Concrete pile caps and reinforcement bars for the bridge piers on the construction ground

About the project

The Nto Ide to Ikot Amba Bridge is a 60-metre span reinforced concrete bridge in Obot Akara Local Government Area, with an 800-metre approach road. The bridge is piled to a depth of 23 metres and is built to carry 450 tonnes, about seven fully loaded cement trucks at once. It reconnects communities that had long been cut off from each other.

The project was started in 2021 by the previous administration of Governor Udom Emmanuel. It was about 60 per cent done when that government left office in May 2023. Governor Umo Eno's administration completed it, keeping his promise to finish projects left by his predecessor. The contractor is Seyang Nigeria Limited.

Governor Umo Eno commissioned the bridge and road on 16 May 2024. At the same event he approved a new road and bridge contract for Mbiaso, also in Obot Akara, and gave it to the same firm. He also approved a model primary school at St. Patrick's Catholic Primary School, Nto Ide.

The bridge is expected to give people a safe crossing all year, make it easier to move farm produce, and shorten trips to markets, schools and health centres. It fits the ARISE Agenda goal of opening up rural communities.

The project at a glance

StatusCompleted
Commissioned16 May 2024
Kind of workRoads and bridges
ServesResidents of Nto Ide and 4 more

Project timeline

Plannedannounced or approved
Work startedsite work begins
Ongoingwork under way
Finishedcompleted or commissioned
Commissioned16 May 2024

What was built

  • 60m-span bridge
  • 800m approach road

Who it serves

People and places connected by this project.

  • Residents of Nto Ide
  • Residents of Ikot Amba
  • Farmers and tradersLocal business
  • Pupils and teachers of the school at Nto IdeEducation
  • Transport operatorsCommuters

Where it helps

  • Trade and income
  • Education
  • Movement and access
  • Health access

Obot Akara LGA at a glance

Where this project sits among all 13 projects recorded in Obot Akara.

13projects
Completed 6 (this project)Ongoing 6Planned 1
Roads and bridges
5
Schools
2
Government and public buildings
1
Jobs and business support
1
Health
1

Impact Analysis

An assessment of the impact of these accomplishments on the people and communities.

For families and communities

People in Nto Ide and Ikot Amba now have a fixed crossing between their communities, which makes visits, school runs and trips for care easier.

For work and income

A bridge lets farm produce and goods cross without a long detour. Road and bridge works in the LGA are tied to local commerce.

Project location

Nto Ide to Ikot Amba

The map shows the area. An exact project pin is still being confirmed.

The map loads as you reach this section.

Development goals

This project supports the goals below. Each figure shows how many of the 429 projects on this portal back the same goal.

  • 9Industry and infrastructure200 of 429 projects

More from Obot Akara

See everything in Obot Akara

Governor Umo Eno speaking

Governor Umo Eno

See what is being done near you

Pick your LGA to see roads, schools, health centres and homes, with photographs.

Choose your LGA