Roads and bridges · Itu LGAOngoing

2.2km Tabernacle Road and environs with 0.97km underground outfall drain

See the message that will be shared

I'm glad to share that work on 2.2km Tabernacle Road and environs with 0.97km underground outfall drain in Itu LGA is under way.

See the photos and the facts here: https://umoeno.cavilconsult.com/projects/itu-2-2km-tabernacle-road-and-environs-with-0-97km-underground/

Does this road make your daily trip easier? Tell me in the comments, and share this with a neighbour so more people can see it.

Download project card

Ongoing construction of the 2.2km Tabernacle Road and its environs with a 0.97km underground outfall drain in Uyo and Itu LGAs. Road works and a deep drain excavation are under way.

Key facts

Area of work
Roads and bridges
LGA
Itu
Status
Ongoing
Length
2.2km
Underground outfall drain
0.97km
LGAs
Itu, Uyo
Contractor
Nsik Engineering Ltd
Flag-off
August 2023, by Governor Umo Eno
Drain depth
Over 12 metres, built with a pipe jacking system and manholes at low points
Drain outfall
Empties into the Calabar-Itu Road drainage
Re-awarded
February 2024

Photos

During work2.2km Tabernacle Road and environs with 0.97km underground outfall drain
During work2.2km Tabernacle Road and environs with 0.97km underground outfall drain

About the project

The Tabernacle Road project covers the 2.2-kilometre Tabernacle Road and the streets around it, together with a 0.97-kilometre underground outfall drain. The road runs off Ikot Ekpene Road and crosses the boundary of Uyo and Itu Local Government Areas of Akwa Ibom State.

The project is funded by the Akwa Ibom State Government and supervised by the Ministry of Works and Fire Service. Governor Pastor Umo Eno flagged off construction in August 2023, and the contract was re-awarded in February 2024. The contractor is Nsik Engineering Limited. Work is still ongoing.

The underground drain is the main part of the job. It is dug more than 12 metres deep and uses a pipe jacking system, with manholes at the low points. It is built to carry storm water under the busy Calabar-Itu Highway and empty it into the highway's drainage. Work on the 2.2-kilometre road is meant to follow once the drain is in place.

The Tabernacle Road area has long suffered from flooding, and homes along the road were flooded again during heavy rain in 2026. When finished, the project is expected to end the flooding, let residents return to affected streets and make movement easier between Uyo and Itu. It is part of the ARISE Agenda effort to protect and open up communities around the state capital.

The project at a glance

StatusOngoing
Length2.2km
Kind of workRoads and bridges
ServesPeople of Itu

Project timeline

Plannedannounced or approved
Work startedsite work begins
Ongoingwork under way
Finishedcompleted or commissioned

Itu LGA at a glance

Where this project sits among all 18 projects recorded in Itu.

18projects
Completed 4Ongoing 11 (this project)Planned 2Status not stated 1
Roads and bridges
10
Jobs and business support
2
Homes for vulnerable people
2
Schools
1
Health
1

Project location

2.2km Tabernacle Road and environs with 0.97km underground outfall drain

The map shows the area. An exact project pin is still being confirmed.

The map loads as you reach this section.

Development goals

This project supports the goals below. Each figure shows how many of the 429 projects on this portal back the same goal.

  • 9Industry and infrastructure200 of 429 projects
  • 11Sustainable communities133 of 429 projects

More from Itu

See everything in Itu

Governor Umo Eno

Governor Umo Eno

See what is being done near you

Pick your LGA to see roads, schools, health centres and homes, with photographs.

Choose your LGA