ARISEUmo Eno Legacy

Home / Abak / Project

Roads and bridges · Abak LGACompleted

Pepsi Junction - Ukpom Abak Road

See the message that will be shared

I'm proud to share that work on Pepsi Junction - Ukpom Abak Road in Abak LGA is finished. Reconstruction of a 10.412km road that had been in very poor condition for some years.

See the photos and the facts here: https://umoeno.cavilconsult.com/projects/abak-pepsi-junction-ukpom-abak-road/

Does this road make your daily trip easier? Tell me in the comments, and share this with a neighbour so more people can see it.

Download project card

Reconstruction of a 10.412km road that had been in very poor condition for some years. It gives a second link between Uyo and Abak and connects over 30 communities in Abak, Ibiono Ibom and Uyo. It improves access to General Hospital Ukpom Abak, Mercy Hospital Abak and other institutions, and it helped address insecurity in the area. The road has been completed and commissioned.

Key facts

Area of work
Roads and bridges
LGA
Abak
Status
Completed
Where
Pepsi Junction to Ukpom Abak
Length
10.412km
Work type
Reconstruction
Communities connected
Over 30, in Abak, Ibiono Ibom and Uyo
Ministry or agency
Ministry of Works & Fire Service
Contractor
Amitec Construction Company
History
Started by an earlier administration
Started under
Udom Emmanuel
Completed under
Umo Eno
Commissioned
16 July 2025

Photos

Pepsi Junction - Ukpom Abak Road
FinishedPepsi Junction - Ukpom Abak Road
FinishedPepsi Junction - Ukpom Abak Road
FinishedPepsi Junction - Ukpom Abak Road
Low aerial view of the completed asphalt road through the town
Low aerial view of the completed asphalt road through the town

About the project

The 10.412km Uyo - Ukpom Abak Road has been successfully completed and commissioned under the ARISE Agenda to improve connectivity between rural communities and the Uyo metropolis.

The project was inherited from the previous administration and completed as part of the State Government’s commitment to continuity in governance and infrastructure renewal. Out of the 10.412km stretch, 4.4km was fully reconstructed, while the remaining sections were overlaid to restore the road to a durable and motorable standard.

The road serves as a major transport corridor linking Abak communities to Uyo, easing traffic flow, improving mobility, and enhancing access to markets, schools, and healthcare facilities.

The project was delivered through the Ministry of Works and Fire Service in collaboration with Amitec Construction Company. As part of its Corporate Social Responsibility, the contractor provided six water boreholes to communities along the project axis.

This project strengthens economic activity within the corridor and reinforces the State’s commitment to completing inherited infrastructure projects across the 31 Local Government Areas.

The project at a glance

StatusCompleted
Length10.412km
Kind of workRoads and bridges
ServesResidents of over 30 communities in Abak, Ibiono Ibom and Uyo and 4 more

Project timeline

Plannedannounced or approved
Work startedsite work begins
Ongoingwork under way
Finishedcompleted or commissioned
Commissioned16 July 2025

What was built

  • 10.412km reconstructed road
  • Paved carriageway

Who it serves

People and places connected by this project.

  • Residents of over 30 communities in Abak, Ibiono Ibom and Uyo
  • Patients and staff of General Hospital Ukpom Abak and Mercy Hospital AbakHealth
  • Students and staff of the Nigerian Christian Bible College, UkpomEducation
  • Farmers and tradersLocal business
  • Travellers between Uyo and AbakCommuters

Where it helps

  • Health access
  • Trade and income
  • Movement and access
  • Education
  • Safety and security

Abak LGA at a glance

Where this project sits among all 14 projects recorded in Abak.

14projects
Completed 7 (this project)Ongoing 6Status not stated 1
Roads and bridges
5
Schools
3
Homes for vulnerable people
3
Health
1
Farming
1

Impact Analysis

An assessment of the impact of these accomplishments on the people and communities.

For families and communities

The road makes it easier to reach the two hospitals and other institutions along it. It also addressed insecurity that had started to grow in the area.

For work and income

Businesses and livelihoods that suffered while the road was bad have received a boost.

Project location

Pepsi Junction to Ukpom Abak

The map shows the area. An exact project pin is still being confirmed.

The map loads as you reach this section.

Development goals

This project supports the goals below. Each figure shows how many of the 429 projects on this portal back the same goal.

  • 9Industry and infrastructure200 of 429 projects
  • 3Good health52 of 429 projects
  • 16Peace and institutions36 of 429 projects

More from Abak

See everything in Abak

Governor Umo Eno speaking

Governor Umo Eno

See what is being done near you

Pick your LGA to see roads, schools, health centres and homes, with photographs.

Choose your LGA