ARISEUmo Eno Legacy

Home / Abak / Project

Roads and bridges · Abak LGAOngoing

Ikot Ekang - Obiobom - Ikot Ekpat - Abak Itenghe - Uruk Ata Nsidung - Midim - Ikot Edong Road with two bridges

See the message that will be shared

I'm glad to share that work on Ikot Ekang - Obiobom - Ikot Ekpat - Abak Itenghe - Uruk Ata Nsidung - Midim - Ikot Edong Road with two bridges in Abak LGA is under way. Construction of a 16km road with two bridges.

See the photos and the facts here: https://umoeno.cavilconsult.com/projects/abak-ikot-ekang-obiobom-ikot-ekpat-abak-itenghe-uruk-ata-nsidung/

Does this road make your daily trip easier? Tell me in the comments, and share this with a neighbour so more people can see it.

Download project card

Construction of a 16km road with two bridges. The road will open up communities along the route across three Local Government Areas. It is expected to help farmers move produce to markets and to reconnect communities on both sides of the bridges. Work was ongoing in 2025.

Key facts

Area of work
Roads and bridges
LGA
Abak
Status
Ongoing
Where
Ikot Ekang, Obiobom, Ikot Ekpat, Abak Itenghe, Uruk Ata Nsidung, Midim, Ikot Edong
Length
16km
Bridges
2 bridges, each with a 20m span
Local Government Areas
Abak, Ukanafun and Etim Ekpo
Inspected
October 2025 (Abak project tracking tour); listed as ongoing, 16 km with two bridges

Photos

BeforeBefore: Ikot Ekang - Obiobom - Ikot Ekpat - Abak Itenghe - Uruk Ata Nsidung - Midim - Ikot Edong Road with two bridges
AfterAfter: Ikot Ekang - Obiobom - Ikot Ekpat - Abak Itenghe - Uruk Ata Nsidung - Midim - Ikot Edong Road with two bridges
Ikot Ekang - Obiobom - Ikot Ekpat - Abak Itenghe - Uruk Ata Nsidung - Midim - Ikot Edong Road with two bridges
Ikot Ekang - Obiobom - Ikot Ekpat - Abak Itenghe - Uruk Ata Nsidung - Midim - Ikot Edong Road with two bridges
Ikot Ekang - Obiobom - Ikot Ekpat - Abak Itenghe - Uruk Ata Nsidung - Midim - Ikot Edong Road with two bridges
Aerial view of a paved road junction on the route
Aerial view of a paved road junction on the route
During workThe road cutting through bush, seen from above
The road cutting through bush, seen from above

About the project

This is a 16-kilometre road with two bridges, each with a 20-metre span. It runs through Ikot Ekang, Obio Obom, Ikot Ekpat, Abak Itenghe, Uruk Ata Nsidung, Midim and Ikot Edong. It starts in Abak Local Government Area and links it with neighbouring Local Government Areas, including Etim Ekpo.

The Akwa Ibom State Government is building the road under Governor Umo Eno. State officials inspected it in October 2025 during the Abak project tracking tour, when work was ongoing. Part of the route has already been surfaced. Work is ongoing.

The road and its bridges are meant to open up farming communities that have long had poor links to Abak town and to each other. Once complete, they are expected to make it easier to move farm produce, reach markets, schools and health centres, and travel between the LGAs on the route. The project is part of the ARISE Agenda drive to connect rural communities.

The project at a glance

StatusOngoing
Length16km
Kind of workRoads and bridges
ServesResidents of the seven communities on the route and 3 more

Project timeline

Plannedannounced or approved
Work startedsite work begins
Ongoingwork under way
Finishedcompleted or commissioned

What was built

  • 16km road
  • Two bridges
  • Paved section

Who it serves

People and places connected by this project.

  • Residents of the seven communities on the route
  • Farmers moving produce to marketLocal business
  • Traders and transport operatorsLocal business
  • Families with relatives on the other side of the bridgesHouseholds

Where it helps

  • Trade and income
  • Movement and access

Abak LGA at a glance

Where this project sits among all 14 projects recorded in Abak.

14projects
Completed 7Ongoing 6 (this project)Status not stated 1
Roads and bridges
5
Schools
3
Homes for vulnerable people
3
Health
1
Farming
1

Impact Analysis

An assessment of the impact of these accomplishments on the people and communities.

For families and communities

The bridges will help people in these communities reconnect with their relatives across the state. When finished, the road is also expected to make it easier to reach essential services along the route.

For work and income

The road is expected to support trade and other business along the corridor, most of all the movement of farm produce from these communities to the markets.

Project location

Ikot Ekang, Obiobom, Ikot Ekpat, Abak Itenghe, Uruk Ata Nsidung, Midim, Ikot Edong

The map shows the area. An exact project pin is still being confirmed.

The map loads as you reach this section.

Development goals

This project supports the goals below. Each figure shows how many of the 429 projects on this portal back the same goal.

  • 9Industry and infrastructure200 of 429 projects
  • 2Zero hunger18 of 429 projects

More from Abak

See everything in Abak

Governor Umo Eno

Governor Umo Eno

See what is being done near you

Pick your LGA to see roads, schools, health centres and homes, with photographs.

Choose your LGA